The fuel injection optimizer from Hitchcock's came in the other day. It shouldn't take too long to get it installed on the Himalayan.
I finished up the Go-Go carrier but after loading the scooter up on it, with the soft suspension on the little Buick, it sagged down more than I liked it. I moved the hole location by welding up part of the holes and then put the tongue on the mill and bored a new hole that will have the carrier angled up 5 degrees. I haven't tried it yet due to the wet paint, but I was confident enough to paint it without installing it on the car - mostly because the wife was on the road with the car at the time. If it doesn't work this time, might have to cut the tongue apart and weld in a piece of tubing to raise it up and change the angle. Let's hope that doesn't need to be done. I want to move on from this one.
No comments:
Post a Comment